Preview Mode Links will not work in preview mode

Elevate Construction


Jun 29, 2023

Jason continues the Last Planner implementation series with the fifth checklist item: designing your conference room, trailer, and visuals. He compares a plan without the right visual environment to a great view with no window. He walks through the interaction spaces he designed with Greg Lowe at Oakland, including the work planning wall, permitting wall, war corner with a war table, kitchen, conference room, picture wall, and landing space, along with outdoor logistics like the staging area, craft lunchroom, bathrooms, hoist, and crane. His main point is that every meeting in the cycle needs a space and visuals that let the team discuss its agenda, and that the design of the trailer matters as much as the design of the building. He also shares where the podcast, YouTube channel, and LinkedIn stand, and what helps most.

What you鈥檒l learn in this episode:

  • Why the trailer and conference room are the window to your planning, and why a plan needs the right visuals to be seen
  • The interaction spaces from the Oakland design: work planning wall, permitting wall, war corner, kitchen, conference room, picture wall, and landing space
  • How to set up the room: two screens (Takt plan on one, zone maps, logistics, procurement, or roadblocks on the other), printed zone maps under plexiglass for trade partners to mark up, and guides on the back wall
  • How to give every meeting in your cycle a place and visuals that fit its agenda, from the weekly tactical to the worker huddle
  • How to support the podcast: share it, connect on LinkedIn, and subscribe to the Jason Schroeder YouTube channel

Could a trade partner walk into your meeting room and see the plan, the zone maps, and the roadblocks without anyone explaining them?

 

If you like the Elevate Construction podcast, please subscribe for free, and you鈥檒l never miss an episode.  And if you really like the Elevate Construction podcast, I鈥檇 appreciate you telling a friend (Maybe even two 馃槉).

Also, here are links to our YouTube Channels:

路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw